To LUGNET HomepageTo LUGNET News HomepageTo LUGNET Guide Homepage
 Help on Searching
 
Post new message to lugnet.trainsOpen lugnet.trains in your NNTP NewsreaderTo LUGNET News Traffic PageSign In (Members)
 Trains / 2226
    Re: Non-standard track connections —John Gerlach
   (...) 9volt trains will jump that gap with no problems at all. You can kind of see it in this picture, between the grey bascule bridge and the adjoining truss bridge: (URL) bascule section drops down 1 stud apart from the 'fixed' section, it comes (...) (25 years ago, 28-Sep-99, to lugnet.trains)
   
        Re: Non-standard track connections —Larry Pieniazek
   (...) John didn't say which question he was answering. As it turns out, this trick works BOTH to electrically insulate track sections AND to let them be mechanically separated. If you only want electrical insulation your options depend on your (...) (25 years ago, 28-Sep-99, to lugnet.trains)
   
        Re: Non-standard track connections —Mario Ferrari
   John, Larry, Derick... thanks a lot for your help. I think I go with the most impure solutions: electrical tape and exacto knife. This because I don't like to keep the tracks one stud apart. My Lego ethic too doesn't preclude removing parts, after (...) (25 years ago, 30-Sep-99, to lugnet.trains)
 

©2005 LUGNET. All rights reserved. - hosted by steinbruch.info GbR