| | NELUG Layout at the Greenberg Train Show Chris Phillips
|
| | NELUG participated in the Greenberg Toy and Train Show this past weekend with a 10'x20' layout. As usual, a great time was had by all. I am still sorting through the hundreds of pictures that I took of the display, so many of these should appear on (...) (21 years ago, 17-Nov-03, to lugnet.trains, lugnet.org.us.nelug)
|
| | |
| | | | Re: NELUG Layout at the Greenberg Train Show David Koudys
|
| | | | In lugnet.trains, Chris Phillips wrote: <snip> (...) The crossing gates are great! Mind if I try making one for my layout? Looking forward to the other pics. Dave K (21 years ago, 17-Nov-03, to lugnet.trains, lugnet.org.us.nelug)
|
| | | | |
| | | | | | Re: NELUG Layout at the Greenberg Train Show Chris Phillips
|
| | | | | (...) Not only do I not mind, but I made the plans available on BrickShelf: (URL) gate works better with only six Technic Pin Connector cylinders on the gate instead of the eight that are shown on the plans. I never drew up plans for the signal (...) (21 years ago, 17-Nov-03, to lugnet.trains, lugnet.org.us.nelug)
|
| | | | | |
| | | | Re: NELUG Layout at the Greenberg Train Show Tim David
|
| | | | (...) they work nicely, tho I think you should move the 'upwind' sensor further away so the barrier is down before the train gets there tim (21 years ago, 17-Nov-03, to lugnet.trains, lugnet.org.us.nelug)
|
| | | | |
| | | | | | Re: NELUG Layout at the Greenberg Train Show Chris Phillips
|
| | | | (...) Thanks! Good suggestion. I usually do have the sensors further upstream than I did for this show. As I mentioned earlier, I had started out with a new gate design on the layout that operates more quickly, therefore more lead time was not (...) (21 years ago, 17-Nov-03, to lugnet.trains, lugnet.org.us.nelug)
|
| | | | |