To LUGNET HomepageTo LUGNET News HomepageTo LUGNET Guide Homepage
 Help on Searching
 
Post new message to lugnet.trainsOpen lugnet.trains in your NNTP NewsreaderTo LUGNET News Traffic PageSign In (Members)
 Trains / 18087
    Re: ROUNDHOUSE builders Rejoice —Wayne Sardullo
    (...) Sorry for the delay.. Jason you are right however, the solution is even easier then that by adding a 12v conducting rail the the center of the 9 volt track. I didn't post lastnight about this because I do not have any 12v conducting rails or (...) (22 years ago, 20-Oct-02, to lugnet.trains)
   
        Re: ROUNDHOUSE builders Rejoice —Frank Filz
   (...) You will also have to modify the 12v conductor rails to be able to attach them to 9v track. They have protrusions on the underside which interfere with the studs on the 9v ties (remember, 9v track has half the tie spacing that grey era 12v (...) (22 years ago, 21-Oct-02, to lugnet.trains)
 

©2005 LUGNET. All rights reserved. - hosted by steinbruch.info GbR