To LUGNET HomepageTo LUGNET News HomepageTo LUGNET Guide Homepage
 Help on Searching
 
Post new message to lugnet.trainsOpen lugnet.trains in your NNTP NewsreaderTo LUGNET News Traffic PageSign In (Members)
 Trains / *9585 (-10)
  Re: Lego Cog Train
 
"Yendra" <yendra@nebi.com> wrote in message news:G6ps81.Ev9@lugnet.com... (...) Train. (...) Check out Heiner Berg's page: (URL) I JUST (...) school, (...) Welcome to the club :-) -Frank (24 years ago, 6-Jan-01, to lugnet.trains)
 
  Re: SuperTrain 2001 layout - Switching Yard
 
I like your yard, Steve. James' yard was less dense, but it did look nice and tidy. I just realized that there is only one loop of track. With a layout this size, it would make sense to have several things moving around simultaneously. Otherwise, it (...) (24 years ago, 6-Jan-01, to lugnet.org.ca.nalug, lugnet.trains)
 
  Re: SuperTrain 2001 layout - Switching Yard
 
(...) (URL) shot is of the "industrial side" with the switching yard and the container, oil and auto depots/yards. The empty spot in the lower corner is for hand-outs - there's a matching one on the "town side". SRC StRuCtures (24 years ago, 6-Jan-01, to lugnet.org.ca.nalug, lugnet.trains)
 
  Re: SuperTrain 2001 layout - Switching Yard
 
(...) True - there's no shortage of _floor_ space, and I can always add more tables, but at $1/foot out of my pocket (hopefully reimbursed but no garauntee) I'd like to make maximum use of space. Also, I have to stay within reach of the edge of the (...) (24 years ago, 6-Jan-01, to lugnet.org.ca.nalug, lugnet.trains)
 
  Re: SuperTrain 2001 layout - Switching Yard
 
(...) Yeah - I noticed that AFTER I'd posted it - there should be another switch in there, plus there's still more to add to the totals. Between Michel and I we have almost 250 curved segments which should be plenty. Straights are another story (...) (24 years ago, 6-Jan-01, to lugnet.org.ca.nalug, lugnet.trains)
 
  Re: SuperTrain 2001 layout - Switching Yard
 
(...) Er, one of the tracks isn't connected. So, thats 1173 pieces of train track. My guess is about a minute to place each one. Some as little as a couple seconds, but overall, I think that's a not unexpected rate. That's a *lot* of time! P.S. I've (...) (24 years ago, 6-Jan-01, to lugnet.org.ca.nalug, lugnet.trains)
 
  Lego Cog Train
 
Hey all, first time poster. I got an uncontrollable urge the other day to build myself a Lego Cog Train. I have done this using a 9v train engine, and a 9v motor attached to the train engine. Things are going along fairly smoothly in my mind. Does (...) (24 years ago, 5-Jan-01, to lugnet.trains)
 
  Re: SuperTrain 2001 layout - Mountain Switching
 
(...) ? Why do you want the spurs so close together? If there's one thing we *aren't* short of, it's space. Stick with the geometry. Even a space-eating ladder-style yard works just fine. James (24 years ago, 5-Jan-01, to lugnet.org.ca.nalug, lugnet.trains)
 
  Re: Future of Belville
 
(...) While I haven't read HP yet (but my daughter has), I can speak about Belville, which I like. And does my daughter (13), who also likes Scala (I kiddingly curse TLC for duplicate doll themes;) Although the palettes of both are a bit off for my (...) (24 years ago, 5-Jan-01, to lugnet.belville, lugnet.castle, lugnet.trains, lugnet.dear-lego)
 
  Re: SuperTrain 2001 layout - Mountain Switching
 
(...) Two feet by eight feet (or 6 or 4, but what point is a 2'x4' table?) (...) For the track designer impaired, here's what he's talking about... (URL) nice, but it still doesn't get the tracks any closer together than the standard switch width. (...) (24 years ago, 5-Jan-01, to lugnet.org.ca.nalug, lugnet.trains)


Next Page:  5 more | 10 more | 20 more

Redisplay Messages:  All | Compact

©2005 LUGNET. All rights reserved. - hosted by steinbruch.info GbR