To LUGNET HomepageTo LUGNET News HomepageTo LUGNET Guide Homepage
 Help on Searching
 
Post new message to lugnet.trainsOpen lugnet.trains in your NNTP NewsreaderTo LUGNET News Traffic PageSign In (Members)
 Trains / *2999 (-5)
  Transporting large setups.
 
How do these clubs with the large setups transport them from one show to another? (25 years ago, 27-Nov-99, to lugnet.trains)
 
  Re: Building Bridges
 
(...) I would love to see pictures of this? Do you have a website? Steve Martin (25 years ago, 27-Nov-99, to lugnet.trains)
 
  Re: Remote Switches & GMLTC main lines
 
John N already answered but I will butt in too.. (...) I'm gonna go with "no". I know John said "yes" but from what I saw when running at shows, it was whatever people felt like running. The station in the corner doesn't really have a lot of (...) (25 years ago, 27-Nov-99, to lugnet.trains)
 
  Re: Remote Switches & GMLTC main lines
 
(...) Yes. The third is a short mining loop in the quarry. (...) The passenger line runs along the outside of the layout. This leaves the freight line on the inside and able to freely access the roundhouse and freight yard. (...) Well, it's not (...) (25 years ago, 26-Nov-99, to lugnet.trains)
 
  Re: Building Bridges
 
(...) This was another Q. Can a track this long be power by a single trasformer? Scott A (25 years ago, 26-Nov-99, to lugnet.trains)


Next Page:  5 more | 10 more | 20 more

Redisplay Messages:  All | Compact

©2005 LUGNET. All rights reserved. - hosted by steinbruch.info GbR