|
| | Re: NALUG takes 1st place at GEmTS 2002
|
| That was the control for the automated switches. I'm not sure how exactly it technically worked, but I did get to play with it. It was the work of Kevin Maynes, he will be able to explain how he made it. I will try and track him down so he can (...) (22 years ago, 1-Oct-02, to lugnet.trains, lugnet.org.ca.nalug)
| | | | Re: NALUG takes 1st place at GEmTS 2002
|
| That is the front of the elevators, and is the side that faces the crowd. There are doors that can close, but we leave them open so the crowd can see the grain elevators working. Adam In lugnet.trains, Larry Pieniazek writes: [[snipped]] (...) (22 years ago, 1-Oct-02, to lugnet.trains, lugnet.org.ca.nalug)
| | | | Re: NALUG takes 1st place at GEmTS 2002
|
| Steve, What is this area? (URL) like a control system, could you explain it some? Thanks, jt (...) (22 years ago, 1-Oct-02, to lugnet.trains, lugnet.org.ca.nalug)
| | | | Re: NALUG takes 1st place at GEmTS 2002
|
| (...) I meant links to the folder, and or the filename pattern, but it's been moderated now. (...) Can you comment on this pic: (URL) is going on in the back of these elevators? Or is it the front? It looks like the open back of the elevator is the (...) (22 years ago, 1-Oct-02, to lugnet.trains, lugnet.org.ca.nalug)
| | | | DB 211 in "Verkehrsrot" colors
|
| As a diversion today, and after seeing some magnificent engines built using 5- en 7-wide concepts, I started building one of my favorite German diesel engines, the BR 211 B'B' diesel. Specs so far : - Built on a constructed bottom plate, 34 studs (...) (22 years ago, 30-Sep-02, to lugnet.trains)
| |