| | Re: number of straight tracks with the Metroliner
|
|
(...) I didn't remember correctly. It the overlap is offset by 1/2 stud making the total length only 17 studs (~5.35"). Steve (23 years ago, 29-Aug-01, to lugnet.trains)
|
|
| | Re: number of straight tracks with the Metroliner
|
|
(...) I realized we were making this discussion to difficult. Duh, RTFM. (URL) (23 years ago, 29-Aug-01, to lugnet.trains)
|
|
| | Re: number of straight tracks with the Metroliner
|
|
(...) of track has tabs that stick out on the end to connect to the next piece of track which makes it slightly longer (2 studs, IIRC. That would make it ~5.6"). Of course, because the tabs overlap each extra piece of track only adds 5 1/16". Steve (...) (23 years ago, 29-Aug-01, to lugnet.trains)
|
|
| | Re: PNLTC's LEGOLAND photo gallery is up (finally)
|
|
(...) Mmmm. Transluscent fruit :-) Great display. Good 3-D work and lots of character throughout. I particularly like the mountain town and the wonderful cathedral. Amy (23 years ago, 29-Aug-01, to lugnet.trains)
|
|
| | Re: PNLTC's LEGOLAND photo gallery is up (finally)
|
|
(...) I found a lot of the images to be broken on first pass as well- but they always came in when I forced IE to reload the image (right-click/show image). -- Tony Hafner www.hafhead.com www.pnltc.org (23 years ago, 29-Aug-01, to lugnet.trains)
|