To LUGNET HomepageTo LUGNET News HomepageTo LUGNET Guide Homepage
 Help on Searching
 
Post new message to lugnet.spaceOpen lugnet.space in your NNTP NewsreaderTo LUGNET News Traffic PageSign In (Members)
 Space / 13104
13103  |  13105
Subject: 
Re: Final transmission...
Newsgroups: 
lugnet.build.mecha, lugnet.space, lugnet.loc.us.ks
Date: 
Wed, 27 Feb 2002 21:21:49 GMT
Viewed: 
37 times
  
sounds very spooky
what happened to that poor man is a great travesty to the nation as a whole
vengence is needed in the form of all new mecha by Mr. Knaak and his crack team
to your work benches gentlemen

-------------------------------------------------------------------------------

In lugnet.build.mecha, Tony Knaak writes:
February 26, 2001
900 hours
Final schedueled tests for the BD4 Powersuit started smoothly. The unit was
air dropped over Sector 34 to perform routine systems tests.
1000 hours
Test pilot Gary Hatcher reports electronic systems malfunction between heavy
static. Last image transmission from the BD4 shows what appears to be a new
mobil armor model.
       http://www.brickshelf.com/cgi-bin/gallery.cgi?f=12674
1300 hours
Rumble of the BD4 Powersuit was found in Sector 34. Lt. Hatcher's
unfortunate sacrifice will be avenged. Continued recon of the surrounding
sectors has been doubled. Be on alert for more data on this new menace.

out
tk



Message is in Reply To:
  Final transmission...
 
February 26, 2001 900 hours Final schedueled tests for the BD4 Powersuit started smoothly. The unit was air dropped over Sector 34 to perform routine systems tests. 1000 hours Test pilot Gary Hatcher reports electronic systems malfunction between (...) (23 years ago, 26-Feb-02, to lugnet.build.mecha, lugnet.space, lugnet.loc.us.ks)

3 Messages in This Thread:


Entire Thread on One Page:
Nested:  All | Brief | Compact | Dots
Linear:  All | Brief | Compact
    

Custom Search

©2005 LUGNET. All rights reserved. - hosted by steinbruch.info GbR