To LUGNET HomepageTo LUGNET News HomepageTo LUGNET Guide Homepage
 Help on Searching
 
Post new message to lugnet.build.mechaOpen lugnet.build.mecha in your NNTP NewsreaderTo LUGNET News Traffic PageSign In (Members)
 Building / Mecha / 6047
6046  |  6048
Subject: 
Final transmission...
Newsgroups: 
lugnet.build.mecha, lugnet.space, lugnet.loc.us.ks
Date: 
Tue, 26 Feb 2002 21:36:36 GMT
Viewed: 
1602 times
  
February 26, 2001
900 hours
  Final schedueled tests for the BD4 Powersuit started smoothly. The unit was
  air dropped over Sector 34 to perform routine systems tests.
1000 hours
  Test pilot Gary Hatcher reports electronic systems malfunction between heavy
  static. Last image transmission from the BD4 shows what appears to be a new
  mobil armor model.
        http://www.brickshelf.com/cgi-bin/gallery.cgi?f=12674
1300 hours
  Rumble of the BD4 Powersuit was found in Sector 34. Lt. Hatcher's
  unfortunate sacrifice will be avenged. Continued recon of the surrounding
  sectors has been doubled. Be on alert for more data on this new menace.

out
tk



Message has 2 Replies:
  Re: Final transmission...
 
Ohhh, looks sleek! uh oh, my transmission is being intercepted, what is is! Legomaster (...) (23 years ago, 27-Feb-02, to lugnet.build.mecha, lugnet.space, lugnet.loc.us.ks)
  Re: Final transmission...
 
sounds very spooky what happened to that poor man is a great travesty to the nation as a whole vengence is needed in the form of all new mecha by Mr. Knaak and his crack team to your work benches gentlemen ---...--- (...) (23 years ago, 27-Feb-02, to lugnet.build.mecha, lugnet.space, lugnet.loc.us.ks)

3 Messages in This Thread:


Entire Thread on One Page:
Nested:  All | Brief | Compact | Dots
Linear:  All | Brief | Compact
    

Custom Search

©2005 LUGNET. All rights reserved. - hosted by steinbruch.info GbR