To LUGNET HomepageTo LUGNET News HomepageTo LUGNET Guide Homepage
 Help on Searching
 
Post new message to lugnet.robotics.nxtOpen lugnet.robotics.nxt in your NNTP NewsreaderTo LUGNET News Traffic PageSign In (Members)
 Robotics / NXT / 931 (-10)
  Re: New pbLua Beta13o - Now with FLASH Writing!
 
(...) Way cool ! Exciting ! (17 years ago, 12-Sep-07, to lugnet.robotics.nxt)
 
  New pbLua Beta13o - Now with FLASH Writing!
 
All of you that have been helping to test pbLua.... I have released another Beta of pbLua - and it's got FLASH writing (and reading) goodness in it. (URL) It does not yet have the ability to boot from a string in FLASH but it's very close. The (...) (17 years ago, 12-Sep-07, to lugnet.robotics.nxt)
 
  Re: Ultrasonic Sensor iS "Slow"
 
(...) The 15 ms that John reported is the time it takes for a sound pulse to travel 500 mm, the round trip distance at the maximum advertised range of the US sensor. An interesting coincidence? Roger Glassey (17 years ago, 11-Sep-07, to lugnet.robotics.nxt)
 
  Ultrasonic Sensor iS "Slow"
 
Original Thread title was "Re: Ooops! NXT Software Comparison correction / I2C Messaging Speed". I've renamed as worth a separate thread. (...) You're right!! If you poll the sensor too fast, it definitely reports wrong distances. I'm doing some (...) (17 years ago, 7-Sep-07, to lugnet.robotics.nxt)
 
  RE: NXT-G/ROBOTC Firmware Scheduler and Clump Priority
 
Holy cow! This is fun to read... I wish I have the time to further discuss this regarding the events handling with nxt. Follow up later. Thanks for such detailed info. --Elizabeth -----Original Message----- From: news-gateway@lugnet.com (...) (17 years ago, 7-Sep-07, to lugnet.robotics.nxt)
 
  RE: Ooops! NXT Software Comparison correction / I2C Messaging Speed
 
(...) I want to list both. First, the one-to-one mapping, and second (with some explanation) the code with a second task. Several other pieces of software have an "optimized" version of code, and it makes sense to do the same for NBC. Steve (17 years ago, 6-Sep-07, to lugnet.robotics.nxt)
 
  Re: NXT-G/ROBOTC Firmware Scheduler and Clump Priority
 
Wow! Very interesting posting. Thanks for revealing that, Dick! Zitat von Dick Swan <dickswan@sbcglobal.net>: (...) ---...--- This message was sent using IMP, the Internet Messaging Program. (17 years ago, 6-Sep-07, to lugnet.robotics.nxt)
 
  NXT-G/ROBOTC Firmware Scheduler and Clump Priority
 
In a typical operating system (OS), tasks are scheduled on a priority basis. The highest priority task always executes ahead of lower priority tasks. If there are multiple tasks at the highest priority, then they are typically executed in a round (...) (17 years ago, 6-Sep-07, to lugnet.robotics.nxt)
 
  RE: Ooops! NXT Software Comparison correction
 
(...) After tuning, NBC achieved 73K test cycles. It achieved these great results by setting the task "priority" to 200. Unfortunately, unless the NXT-G task scheduler has been rewritten, these results might be a little too high. A NXT-G task (or (...) (17 years ago, 6-Sep-07, to lugnet.robotics.nxt)
 
  RE: Ooops! NXT Software Comparison correction / I2C Messaging Speed
 
(...) Nobody cheated or is dishonest. Everyone who writes firmware for the NXT is well-intentioned "good" people. Let's not mislabel good modern programming practice -- i.e. hardware device drivers integrated into the low-level firmware -- as (...) (17 years ago, 6-Sep-07, to lugnet.robotics.nxt)


Next Page:  5 more | 10 more | 20 more

Redisplay Messages:  All | Compact

©2005 LUGNET. All rights reserved. - hosted by steinbruch.info GbR