Subject:
|
Re: Layout perspective...
|
Newsgroups:
|
lugnet.org.us.nelug
|
Date:
|
Wed, 1 Nov 2000 20:18:05 GMT
|
Viewed:
|
640 times
|
| |
| |
In lugnet.org.us.nelug, Eric Joslin writes:
> In lugnet.org.us.nelug, Eric Kingsley writes:
>
> > Actually if we can do 2 trains running at the same time this is pretty much
> > what I would like the track to look like. I realize that getting that many
> > baseplates probably isn't realistic however.
>
> Why not? After all, we have that, umm, thing we were discussing in that, umm,
> other forum that could maybe help. I don't think it would be too taxing on...
> that is to say...
Well umm you are right of course but I didn't want to spend anything without
group approval. Actually I have my catalog here. Give me some time to figure
out the cost of doing this and then I will post something in the "Other Forum"
to see what people think.
>
> Uh. Nevermind, I think you get the point.
>
> Why don't we go with this? We can start laying claim to bits of it, saying
> what we have and where it'll fit.
That would be a hugh benifit of doing it this way.
Eric Kingsley
The New England LEGO Users Group
http://www.nelug.org/
|
|
Message is in Reply To:
| | Re: Layout perspective...
|
| (...) Why not? After all, we have that, umm, thing we were discussing in that, umm, other forum that could maybe help. I don't think it would be too taxing on... that is to say... Uh. Nevermind, I think you get the point. Why don't we go with this? (...) (24 years ago, 1-Nov-00, to lugnet.org.us.nelug)
|
5 Messages in This Thread:
- Entire Thread on One Page:
- Nested:
All | Brief | Compact | Dots
Linear:
All | Brief | Compact
|
|
|
|