|
|
 | | Re: clearance on side of tracks
|
| My rule of thumb is to attach 2x3 bricks to the inside of a curve's ties and make sure that the building comes no closer than that (i.e., the building is always 2 studs away from the inside curve.) The outside may require even more clearance, but I (...) (25 years ago, 13-Jun-01, to lugnet.org.us.nclug)
| | |  | | Re: clearance on side of tracks
|
| (...) Well first here is a link to the most recent NELUG layout. (URL) your building is on the outside of the curve of track you don't have a problem. (By that I mean really close to not "on top of"). The inside corners are what you really need to (...) (25 years ago, 13-Jun-01, to lugnet.org.us.nclug)
| | |  | | clearance on side of tracks
|
| Any suggestions on a general rule as to how much space is prudent to leave on either side of track for a variety of trains to easily negotiate around curves? This is for NCLUG/NCLTC's upcoming GATS. I am trying to plan my plot layout. I have one (...) (25 years ago, 13-Jun-01, to lugnet.trains, lugnet.org.us.nclug, lugnet.trains.org)
| | |  | | Robotics Club in Norfolk, VA
|
| Hi. I'm putting together a robotics/Mindstorms user group in Norfolk, VA. If you are interested in participating, or have any advice for me on how to get started or reach potential members, please let me know. As soon as I get a few people together (...) (25 years ago, 5-Jun-01, to lugnet.loc.us.va.nor, lugnet.loc.us.va.new, lugnet.org.us.richlug, lugnet.org.us.wamalug, lugnet.org.us.nclug, lugnet.robotics)
| | |  | | Re: GATS Sneak Peak
|
| (...) Seen in: (2 URLs) getting more and more convinced I need to buy some of that wire rack shelving. Unfortunately, the consumer selection doesn't have the best sizes, but I may check out the restaurant supply store on South Saunders street and (...) (25 years ago, 27-May-01, to lugnet.org.us.nclug, lugnet.storage)
| |