| | GBC Train crossing
|
| Well, when I started to type this e-mail, I had a question, but I think I've already answered it. I was thinking about our GBC trains. If we don't want to run them on the same loop, maybe we could run them on separate loops that cross over each (...) (19 years ago, 15-Sep-05, to lugnet.org.us.laflrc)
| | | | Re: GBC Train crossing
|
| (...) Even better, make the transfer sensors and waiting points as far away as possible while still preserving train-non-crashingness. That way we could run it so the two trains are often (always?) headed for the crossing at the same time, but never (...) (19 years ago, 15-Sep-05, to lugnet.org.us.laflrc)
| | | | Re: GBC Train crossing, IndyLUG & Chibots
|
| (...) Hmm. A very interesting idea just came up. Given that we want to integrate a GBC into a train layout, I just had a cool idea that we could run a non-GBC train THROUGH the GBC. All I need is a sensor to detect where the other train is (or know (...) (19 years ago, 16-Sep-05, to lugnet.org.us.laflrc)
| |