Subject:
|
Re: March Pictures
|
Newsgroups:
|
lugnet.org.us.indylug
|
Date:
|
Fri, 21 Mar 2003 19:09:47 GMT
|
Viewed:
|
514 times
|
| |
| |
In lugnet.org.us.indylug, Larry Pieniazek writes:
> In lugnet.org.us.indylug, Mark Peterson writes:
> > march pictures are now up at
> > http://www.brickshelf.com/cgi-bin/gallery.cgi?f=37688
> >
> > also febuary's pictures are up at
> > http://www.brickshelf.com/cgi-bin/gallery.cgi?f=36123
> >
> > mark
>
> Some of us would love to hear a bit more about the mechanization you guys
> did to the monorail reverser and switch tracks...
>
> How reliable are these, and did they require any surgery inside the parts,
> the way that many remote controll 9V points solutions do?
>
> Thanks!
That was done by Brian B. Alano. I believe there was no modification done.
they worked easily .
He will have to give you more details
mark
|
|
Message has 1 Reply: | | Re: March Pictures
|
| (...) I'm holding off on details, because we haven't acutally tested them with a train. In summary, tho, no modifications to parts. Used the geared motors. Built-in manual overrides. Main problem with switch mechanism: the train can't switch it (...) (22 years ago, 24-Mar-03, to lugnet.org.us.indylug)
|
Message is in Reply To:
| | Re: March Pictures
|
| (...) Some of us would love to hear a bit more about the mechanization you guys did to the monorail reverser and switch tracks... How reliable are these, and did they require any surgery inside the parts, the way that many remote controll 9V points (...) (22 years ago, 21-Mar-03, to lugnet.org.us.indylug)
|
4 Messages in This Thread:
- Entire Thread on One Page:
- Nested:
All | Brief | Compact | Dots
Linear:
All | Brief | Compact
This Message and its Replies on One Page:
- Nested:
All | Brief | Compact | Dots
Linear:
All | Brief | Compact
|
|
|
|