Subject:
|
Re: New Layout File: V-K0018R.tdl
|
Newsgroups:
|
lugnet.org.ca.vlc
|
Date:
|
Thu, 2 Nov 2000 18:38:42 GMT
|
Viewed:
|
994 times
|
| |
| |
In lugnet.org.ca.vlc, Kevin Wilson writes:
> If we moved the monorail track on the mountain ledge one short section to
> the left, that would free up 4 short sections and also make it easier to
> build the track supports at the left end of the water causeway - at the
> moment the track joins don't line up and it's a bit awkward. All depends on
> how far along the mountain building is.
So what I understand is this: 4 short sections = 1 long section. There are
2 short sections near the bottom, and 3 up top. If we subtract one from the
bottom, we add one to the top. As a result, there are 4 short sections up
top, which can be replaced by 1 long section.
Hehe, shall we make this change official? It won't affect the mountain very
much since the mountain is still on the drawing board! But I promise there
will be a mountain by Friday of this week!
Let me know,
Bryan
|
|
Message has 1 Reply: | | Re: New Layout File: V-K0018R.tdl
|
| Bryan Wong wrote in message ... (...) very (...) Done, and uploaded as v-R0019K.tdl. I also took out the X-tracks since we know what's going there now, and shuffled a couple of road pltes which were affected by the stuff I've been building (not (...) (24 years ago, 2-Nov-00, to lugnet.org.ca.vlc)
|
Message is in Reply To:
| | Re: New Layout File: V-K0018R.tdl
|
| Robin Sather wrote in message <3a0120c1.38529533@l...et.com>... (...) If we moved the monorail track on the mountain ledge one short section to the left, that would free up 4 short sections and also make it easier to build the track supports at the (...) (24 years ago, 2-Nov-00, to lugnet.org.ca.vlc)
|
4 Messages in This Thread:
- Entire Thread on One Page:
- Nested:
All | Brief | Compact | Dots
Linear:
All | Brief | Compact
This Message and its Replies on One Page:
- Nested:
All | Brief | Compact | Dots
Linear:
All | Brief | Compact
|
|
|
|