To LUGNET HomepageTo LUGNET News HomepageTo LUGNET Guide Homepage
 Help on Searching
 
Post new message to lugnet.org.ca.rtltorontoOpen lugnet.org.ca.rtltoronto in your NNTP NewsreaderTo LUGNET News Traffic PageSign In (Members)
 Organizations / Canada / rtlToronto / 6244
    Re: Train 4 Trainyard... —David Koudys
   (...) That's Jeff--Mr. Planning Ahead guy... What's my spare module used for? I'm bringing 3 but only using 2. Just wonderin' Dave K (22 years ago, 14-Jan-03, to lugnet.org.ca.rtltoronto)
   
        Re: Train 4 Trainyard... —Derek Raycraft
     (...) Since Matthias' modules aren't quite standard we'll use yours first, then fill in with Matthias' as needed. Matthias' need to be propped up by an inch to be level with standard modules. Derek (22 years ago, 14-Jan-03, to lugnet.org.ca.rtltoronto)
    
         Re: Train 4 Trainyard... —David Koudys
     (...) Then what I'll do is have a switch after the outside curve in SE corner, going on to my spare module (which I'll landscape et al), and set up the train yard/switches, which will proceed onto Matthias' modules... So the spare module will be (...) (22 years ago, 14-Jan-03, to lugnet.org.ca.rtltoronto)
   
        Re: Train 4 Trainyard... —Jeff Van Winden
   (...) Calum needed an extra, We have an open lot above the dam, and I believe Ben's modules were not quite to spec either. Here is a listing of the mods needed and to be supplied. Derek requires 02 Full modules Jeff E requires 02 Full modules, 2 (...) (22 years ago, 14-Jan-03, to lugnet.org.ca.rtltoronto)
 

©2005 LUGNET. All rights reserved. - hosted by steinbruch.info GbR