To LUGNET HomepageTo LUGNET News HomepageTo LUGNET Guide Homepage
 Help on Searching
 
Post new message to lugnet.org.ca.rtltorontoOpen lugnet.org.ca.rtltoronto in your NNTP NewsreaderTo LUGNET News Traffic PageSign In (Members)
 Organizations / Canada / rtlToronto / 3333
3332  |  3334
Subject: 
Go Train Clearance
Newsgroups: 
lugnet.org.ca.rtltoronto
Date: 
Thu, 17 Jan 2002 19:00:19 GMT
Viewed: 
508 times
  
Speaking of not getting things done in time:

I've started the mods to let the Go train through, but frankly it's a
huge task.  I've got much of an entire module built as a pretty solid
22-brick-deep structure, completely overlapped brick style.  I've got to
remove about 5% of it and shuffle it around and rebuild it to let the Go
Train through.  This is simply more than I've got the time to accomplish
before Saturday :(

But of course I'll feel like a jerk if I have the only module that the
Go Train can't go through.

So here's what I'm doing:  I'm bringing enough brick to effect the
repair/renovation job TO THE EVENT.  When we start to tire of running
the trains, all those interested can dive in and help me shred the
mountain and rebuild it. I figure it'll take 3 knowledgable people about
an hour, maybe 90 minutes.  3 knowledgable people and some amateur help,
2 hours ;)

Fair enough?

Jeff E



Message has 1 Reply:
  Re: Go Train Clearance
 
Don't worry about it. I only wanted it done if time and structure allowed. It looks like I'll be able to run most of the way around this time so I'm happy. I still plan to build 8 wide, so in the long term it would be nice to have one loop that I (...) (23 years ago, 17-Jan-02, to lugnet.org.ca.rtltoronto)

3 Messages in This Thread:

Entire Thread on One Page:
Nested:  All | Brief | Compact | Dots
Linear:  All | Brief | Compact
    

Custom Search

©2005 LUGNET. All rights reserved. - hosted by steinbruch.info GbR