Well, I now have a (somewhat) FP7 built. I also did up a beaver tail coach,
and have 3 coaches, and a steam heat van. A little Yellow Electrical tape, and
it will all look nice. Photos will probably be tomorrow afternoon, comments
will be invited.
As far as track goes, I have ~580 pieces of straght, and ~120 curves, 14
points, (including some specials) and about 10 1/4 and 1/2 straights. If you
are terribly offended by someone with a hacksaw, look elsewhere! (I also did a
bit of filing on the beaver tail coach, but it is not all that noticeable.
James
|