| | Re: Bridge status and ideas (was Constructions for GEMTS 2001)
|
|
James Brown wrote in message ... (...) double (...) I'd have enough to do a double track trestle, but 30" is a bit short... Something longer would look better, but would mean borrowing or acquiring some more black beams. More beams ... I like the (...) (23 years ago, 3-May-01, to lugnet.org.ca.nalug)
|
|
| | Re: Layout possibility
|
|
(...) Looks not bad to me. A bit boring, but otherwise good. A couple of short industrial spurs might be useful. Perhaps a short backwards one from the spur to the turntable could lead to a trainwash. Another possibility is to replace the lower-left (...) (23 years ago, 3-May-01, to lugnet.org.ca.nalug)
|
|
| | Layout possibility
|
|
I had more free time this afternoon than I expected, so whipped up a .tdl... (URL) the .tdl and a .jpg of it are in that gallery) Blue is water on a lowered table (part of the mountain would also be over the lowered table), grey is mountain, green (...) (23 years ago, 2-May-01, to lugnet.org.ca.nalug)
|
|
| | Re: Bridge status and ideas (for GEMTS 2001)
|
|
(...) That calls for a lot of brick, probably more than I have. Verticle lift is what requires the most volume of bricks, if you want it sturdy, and I was fairly well tapped out with the Supertrain mountain at about 2 feet of lift. I've got some (...) (23 years ago, 2-May-01, to lugnet.org.ca.nalug)
|
|
| | Re: Bridge status and ideas (for GEMTS 2001)
|
|
(...) I agree there isn't enough room for elevation ramps. That's why my mountain-valley-bridge suggestion has both tracks at the level of the tables. The upper portion of the mountain peaks are above track/table level, while most of the "two (...) (23 years ago, 2-May-01, to lugnet.org.ca.nalug)
|
|
| | Re: Bridge status and ideas (was Constructions for GEMTS 2001)
|
|
(...) We don't have the room at GEMTS to elevate track to the level required for your arch bridge, not without dedicating a full *two thirds* of our space to elevating the track, and consiquently obscuring at least 1/2 of our layout behind (...) (23 years ago, 2-May-01, to lugnet.org.ca.nalug)
|
|
| | Passenger Train Consists (was: Re: brick/plate height ruler...)
|
|
(...) I just happened to be surfing looking for some Hiawatha info the other night, and came up with this URL: (URL) has scanned an original, full brochure on the Milwaukee Road's Olympian Hiawatha-- what a cool primary resource:-) -John (...) (23 years ago, 27-Apr-01, to lugnet.trains, lugnet.trains.org, lugnet.org.ca.nalug, lugnet.loc.us.ca.sf)
|
|
| | Re: brick/plate height ruler...
|
|
(...) Here is a typical(1) consist for a 15 or so car train from the heavyweight era that I just made up, but which ought to be fairly representative. Starting from the front: -baggage -baggage -Railway Post Office -Dormitory -Coach -Coach -Coach (...) (23 years ago, 27-Apr-01, to lugnet.trains, lugnet.trains.org, lugnet.org.ca.nalug, lugnet.loc.us.ca.sf)
|
|
| | Re: brick/plate height ruler...
|
|
You want a 25-car Metroliner? I can do that ;-) I've just been playing around with designs for various cars. I have enough Metroliners, I just need to figure out HOW MANY of each car to make. I need to build a mail car, 2-3 Club Cars, a ton of (...) (23 years ago, 26-Apr-01, to lugnet.trains, lugnet.trains.org, lugnet.org.ca.nalug, lugnet.loc.us.ca.sf)
|
|
| | Re: Missing Freight Loads from SuperTrain...
|
|
(...) A followup to this. I think I remember putting a single six-pack pallet load into the box with the speed controllers Michel. Have you had a chance yet to go through all your stuff? :-) SRC L#765 (23 years ago, 26-Apr-01, to lugnet.org.ca.nalug)
|