|
| | Re: SuperTrain 2001 layout - Switching Yard
|
| Steve, did James Powell ever send you the layout for his intermodal station? It would be nice to have it on Saturday, to be able to incorporate it into your plans. Michel (24 years ago, 11-Jan-01, to lugnet.org.ca.nalug, lugnet.trains)
| | | | Re: SuperTrain 2001 layout prep Saturday?
|
| Thanks for offering your place James. I might be a bit late, we won't be leaving St Paul until Saturday morning, I'll have my wife drop me off at your door on our way into Edmonton. (James, I misplaced your street address, could you email it to me (...) (24 years ago, 11-Jan-01, to lugnet.org.ca.nalug)
| | | | Re: Show prep on Jan 13
|
| I'll bring one, I had another need for the drill press. To drill a starter hole in the exact middle of some 2 inch long wooden dowels to attach to the inside bottom of the pails, to hold the bottom of the plastic pipe in the exact middle, so that it (...) (24 years ago, 11-Jan-01, to lugnet.org.ca.nalug)
| | | | Re: Show prep on Jan 13
|
| (...) I might be able to borrow a drill press on Saturday, but I'm not sure. I do know that I can go and use it pretty much any old time, so I can drill the rope holes later on. James (24 years ago, 10-Jan-01, to lugnet.org.ca.nalug)
| | | | Re: SuperTrain 2001 layout prep Saturday?
|
| (...) Ok, official it is, then. :) My place, this Saturday, aiming for noon. I can do a pick up (and drop off)run for anyone who can't otherwise get a ride. On the agenda: barricade making Supertrain layout discussion mountain design general yakking (...) (24 years ago, 10-Jan-01, to lugnet.org.ca.nalug)
| |