To LUGNET HomepageTo LUGNET News HomepageTo LUGNET Guide Homepage
 Help on Searching
 
Post new message to lugnet.org.ca.nalugOpen lugnet.org.ca.nalug in your NNTP NewsreaderTo LUGNET News Traffic PageSign In (Members)
 Organizations / Canada / NALUG / *468 (-5)
  Re: SuperTrain 2001 layout
 
(...) I agree with you on all points, but don't you think 750 sq. ft. with nothing in it but us and our coats will look silly? SRC (26 years ago, 6-Jan-01, to lugnet.org.ca.nalug)
 
  Re: SuperTrain 2001 layout - Switching Yard
 
(...) True - there's no shortage of _floor_ space, and I can always add more tables, but at $1/foot out of my pocket (hopefully reimbursed but no garauntee) I'd like to make maximum use of space. Also, I have to stay within reach of the edge of the (...) (26 years ago, 6-Jan-01, to lugnet.org.ca.nalug, lugnet.trains)
 
  Re: SuperTrain 2001 layout - Switching Yard
 
(...) Yeah - I noticed that AFTER I'd posted it - there should be another switch in there, plus there's still more to add to the totals. Between Michel and I we have almost 250 curved segments which should be plenty. Straights are another story (...) (26 years ago, 6-Jan-01, to lugnet.org.ca.nalug, lugnet.trains)
 
  Re: Grain elevator ideas
 
(...) I have a small bag full of MB 1x1x1/3 rounds. Of course, most are grey. Mouldy grain? :-) (26 years ago, 6-Jan-01, to lugnet.org.ca.nalug)
 
  Re: SuperTrain 2001 layout - Switching Yard
 
(...) Er, one of the tracks isn't connected. So, thats 1173 pieces of train track. My guess is about a minute to place each one. Some as little as a couple seconds, but overall, I think that's a not unexpected rate. That's a *lot* of time! P.S. I've (...) (26 years ago, 6-Jan-01, to lugnet.org.ca.nalug, lugnet.trains)

Next Page:  5 more | 10 more | 20 more
Redisplay Messages:  All | Compact

©2005 LUGNET. All rights reserved. - hosted by steinbruch.info GbR