 | | 4-8-8-4 Followup (98% Done)
|
|
Well I am 98% done with Version 1. The only thing I have left is the Conductor Control Room for my Minifigs. I didn't built it because I am trying to make it as close to the real thing as possible. I spent alot of time coming up with a creative look (...) (26 years ago, 30-May-00, to lugnet.loc.us.ny.syr) !
|
| |
 | | Re: Steam Train (4-8-8-4)
|
|
(...) is (...) a (...) and (...) follow-ups to: lugnet.trains Frank (26 years ago, 29-May-00, to lugnet.loc.us.ny.syr, lugnet.trains)
|
| |
 | | Steam Train (4-8-8-4)
|
|
I started this project because its a good way to merge multiple technics. The Concept to get something of this size around a curved, and/or Switched track is a chore. I looked at some of the technics others have used. For some reason everyone went a (...) (26 years ago, 29-May-00, to lugnet.loc.us.ny.syr)
|
| |
 | | Re: Time to get acquainted...
|
|
John Robert Blaze Kanehl wrote in message ... (...) my (...) Rochester (...) A a more geographically-centered location, the site you suggest sounds good. I still would like to have an event at my home sometime, but it does not have to be our first (...) (26 years ago, 29-May-00, to lugnet.loc.us.ny.syr, lugnet.loc.us.ny.uti)
|
| |
 | | Re: Time to get acquainted...
|
|
(...) I would be open to this...I am interviewing for new jobs, often without much notice...but I would be interested... (...) I am divided amongst projects right now...all i various stages of development...none really finished...but I do have one 2 (...) (26 years ago, 29-May-00, to lugnet.loc.us.ny.syr, lugnet.loc.us.ny.uti)
|