| | Third BayLUG get-together (11/99) planning
|
| I should have measured the height of the tables in Fukaya...how much is the heighth difference between those tables and my PNLTC table? :-) We can plan to take over a few tables for the trains. Yes, we should ponder over a layout (one or two loops, (...) (25 years ago, 12-Aug-99, to lugnet.loc.us.ca.sf)
| | | | Re: Third BayLUG get-together (11/99) planning
|
| (...) <grunt> (...) <double grunt> (...) Good idea. FWIW, I don't care what the layout looks like. I mean I do, but I've never done one, so I'd like to see how others do it. (...) Good ideas. Maybe one of the two loops can be for trains which aren't (...) (25 years ago, 12-Aug-99, to lugnet.loc.us.ca.sf)
| |