To LUGNET HomepageTo LUGNET News HomepageTo LUGNET Guide Homepage
 Help on Searching
 
Post new message to lugnet.build.mechaOpen lugnet.build.mecha in your NNTP NewsreaderTo LUGNET News Traffic PageSign In (Members)
 Building / Mecha / 6047
  Final transmission...
 
February 26, 2001 900 hours Final schedueled tests for the BD4 Powersuit started smoothly. The unit was air dropped over Sector 34 to perform routine systems tests. 1000 hours Test pilot Gary Hatcher reports electronic systems malfunction between (...) (22 years ago, 26-Feb-02, to lugnet.build.mecha, lugnet.space, lugnet.loc.us.ks)
 
  Re: Final transmission...
 
Ohhh, looks sleek! uh oh, my transmission is being intercepted, what is is! Legomaster (...) (22 years ago, 27-Feb-02, to lugnet.build.mecha, lugnet.space, lugnet.loc.us.ks)
 
  Re: Final transmission...
 
sounds very spooky what happened to that poor man is a great travesty to the nation as a whole vengence is needed in the form of all new mecha by Mr. Knaak and his crack team to your work benches gentlemen ---...--- (...) (22 years ago, 27-Feb-02, to lugnet.build.mecha, lugnet.space, lugnet.loc.us.ks)

©2005 LUGNET. All rights reserved. - hosted by steinbruch.info GbR