Subject:
|
Re: The Winter Bridge Study
|
Newsgroups:
|
lugnet.build
|
Date:
|
Tue, 18 Feb 2003 22:34:39 GMT
|
Viewed:
|
429 times
|
| |
| |
In lugnet.build, Adrian Egli writes:
> I finally got around to posting all the photos I took of Winter Study 10:
>
> http://www.brickshelf.com/cgi-bin/gallery.cgi?f=33454
>
> Some notes-
>
> Overall span = 480 studs (approx. 12 1/2 feet)
> Overall height (measured from ground to black roadway) = 98 bricks & 2
> plates (approx. 37 inches)
> Time from concept to finished creation = 2 1/2 months (lots of BrickLink and
> LD orders)
> Approximate part count = 15,000 bricks
Nice work, Adrian.
Did you use graph paper or a program or something to get the shpae of the arch?
ROSCO
|
|
Message has 1 Reply: | | Re: The Winter Bridge Study
|
| (...) <snipped> (...) Thanks (...) The shape was a bit tricky. I began by using vellum drafting paper ruled w/ small 1/10 inch squares. A parameter of letting my x-axis be 110 studs and my y-axis be 95 bricks was set. Some "cheating" done by letting (...) (22 years ago, 19-Feb-03, to lugnet.build)
|
Message is in Reply To:
| | The Winter Bridge Study
|
| I finally got around to posting all the photos I took of Winter Study 10: (URL) notes- Overall span = 480 studs (approx. 12 1/2 feet) Overall height (measured from ground to black roadway) = 98 bricks & 2 plates (approx. 37 inches) Time from concept (...) (22 years ago, 17-Feb-03, to lugnet.build) !!
|
5 Messages in This Thread:
- Entire Thread on One Page:
- Nested:
All | Brief | Compact | Dots
Linear:
All | Brief | Compact
This Message and its Replies on One Page:
- Nested:
All | Brief | Compact | Dots
Linear:
All | Brief | Compact
|
|
|
|