 | | Re: The Great Ball Contraption
|
|
(...) Or create other "Types" That's the long-term plan. Of course, any GBC that uses some of these other module types will require considerabily more planning prior to set-up, and it will also make the whole contraption less tolerant to the (...) (21 years ago, 10-Jan-05, to lugnet.robotics)
|
| |
 | | Re: TGBC - The Weakest Link?
|
|
(...) Not really. :) However, we're not expecting the GBC to run 100% of the time. It's not like letting a train run in a circle for eight hours. There are all kinds of things going on at the same time. In our testing, we seemed to run for about 20 (...) (21 years ago, 10-Jan-05, to lugnet.robotics)
|
| |
 | | Re: TGBC - The Weakest Link?
|
|
(...) First, test the modules as they are added to the system to make sure they meet the minimum requirement. Second, watch the whole thing like a hawk, being ready to shut it down to fix such problems. Third, there will have to be some (...) (21 years ago, 10-Jan-05, to lugnet.robotics)
|
| |
 | | Re: The Great Ball Contraption
|
|
(...) The list is on Steve's GBC page, below the Type I standard - just scroll down. (21 years ago, 10-Jan-05, to lugnet.robotics)
|
| |
 | | Re: Dash-9 Diesel Engine - Version 2
|
|
(...) Super Dash-9. With work like that, you must have a source of BNSF images, no? I got a little GP for Christmas, and I am thinking of supersizing it, but I don't know if I should follow the stock color scheme. Is it reasonzbly accurate? Again, (...) (21 years ago, 10-Jan-05, to lugnet.trains)
|