To LUGNET HomepageTo LUGNET News HomepageTo LUGNET Guide Homepage
 Help on Searching
 
Post new message to lugnet.trains.orgOpen lugnet.trains.org in your NNTP NewsreaderTo LUGNET News Traffic PageSign In (Members)
 Trains / Train Organizations / 1049 (-5)
  Re: Show report
 
(...) I'd say a subset of gluing, but what about the electrical tape... :-) SRC StRuCtures (24 years ago, 20-Jan-01, to lugnet.trains.org, lugnet.org.ca.nalug)
 
  Re: Show report
 
(...) It involves cutting but no gluing or painting! How about soldering--is that a fourth deadly sin, a subset of gluing (joining?), or is it just venial? Peter (24 years ago, 19-Jan-01, to lugnet.trains.org, lugnet.org.ca.nalug)
 
  Re: Baseplate vs Brick landscape (was: Re: Show report)
 
(...) Incedentially, we used some of the trees to stablize the plates. We placed trees on the four corners junctions of four plates to lock them into position. The plates were green and so were the tree bases. You might also want to dig up som 2x2 (...) (24 years ago, 19-Jan-01, to lugnet.trains.org)
 
  Re: Show report
 
(...) A problem we encountered with wiring was wire length. Because we did not have enough long (Mindstorms) wires we had to place controllers in inconvienent places. If you are not a 100% purist you should consider making some long exteneders. Some (...) (24 years ago, 19-Jan-01, to lugnet.trains.org, lugnet.org.ca.nalug)
 
  Re: Three Dimensions (was: Show report)
 
(...) I thought there was rule that at some point on the layout the trains had to cross over each other. ;-) The layout we are working on has a climb into a mountain, where a ski resort will be and three tunnels to provide transaction from scene to (...) (24 years ago, 19-Jan-01, to lugnet.trains.org, lugnet.org.ca.nalug)


Next Page:  5 more | 10 more | 20 more

Redisplay Messages:  All | Compact

©2005 LUGNET. All rights reserved. - hosted by steinbruch.info GbR