To LUGNET HomepageTo LUGNET News HomepageTo LUGNET Guide Homepage
 Help on Searching
 
Post new message to lugnet.trainsOpen lugnet.trains in your NNTP NewsreaderTo LUGNET News Traffic PageSign In (Members)
 Trains / 26064
  Reliable Switch Point Control with Pneumatics
 
Here's a reliable scheme for controlling unmodified switch points with pneumatics. This scheme is for use on track that is raised up off the baseplate in modules. I have reduced the depth required below the track to a minimum of 9 plates in the (...) (19 years ago, 19-Oct-05, to lugnet.trains, lugnet.technic, lugnet.loc.uk, lugnet.build, lugnet.announce.moc) ! 

©2005 LUGNET. All rights reserved. - hosted by steinbruch.info GbR