Subject:
|
Re: Motorizing 9V switch points (translation from french)
|
Newsgroups:
|
lugnet.trains
|
Date:
|
Sun, 14 Dec 2003 21:23:55 GMT
|
Viewed:
|
2605 times
|
| |
| |
In lugnet.trains, Philippe Label wrote:
...
|
standard inter-track space. Actually it should fit in 12 studs, so there are
2 studs free on each side of the track to be safe with large engines and long
|
...
Ooops, not 16 but 8, and not 12 but 4 :/ Sorry.
Philippe.
|
|
Message is in Reply To:
| | Re: Motorizing 9V switch points (translation from french)
|
| (...) Hi Ed, I went on testing your proposal. It works so fine, I planned to introduce Amaury Jacquot's modification of Chris Alano's mechanism you use to reduce a little bit the footprint (expecially the width) of the power unit. You will see that (...) (21 years ago, 13-Dec-03, to lugnet.trains, FTX)
|
30 Messages in This Thread:
- Entire Thread on One Page:
- Nested:
All | Brief | Compact | Dots
Linear:
All | Brief | Compact
|
|
|
|