To LUGNET HomepageTo LUGNET News HomepageTo LUGNET Guide Homepage
 Help on Searching
 
Post new message to lugnet.trainsOpen lugnet.trains in your NNTP NewsreaderTo LUGNET News Traffic PageSign In (Members)
 Trains / 208
207  |  209
Subject: 
Re: Looking for review of 4555
Newsgroups: 
lugnet.trains
Date: 
Thu, 3 Dec 1998 15:07:25 GMT
Reply-To: 
neonglass@earthlink(StopSpammers).net
Viewed: 
3115 times
  
Jeremy Dailey wrote:

I bought one.  In its existing configuration, though, two of the three
trains I have (#4559 and #4565) don't clear the side of the overhead
"crane".  I think the tracks that the overhead crane run in need to be moved
out two or three studs to decently clear without toppling the unit.

It's not a bad set, though.  Pricey, but...

-Jeremy.

I agree with the need for more space between the track and the crane.  I
found that moving the crane over one stud was enough to give clearance
to passing trains.  Best is to locate the freight station on a siding
and back the train into it.

Larry Andersen



1 Message in This Thread:

Entire Thread on One Page:
Nested:  All | Brief | Compact | Dots
Linear:  All | Brief | Compact
    

Custom Search

©2005 LUGNET. All rights reserved. - hosted by steinbruch.info GbR