| | Re: Train tables Thomas P. Rafert
| | | Maybe I'm taking this the wrong way. See comments below (...) Well, it's almost from scratch. We work on a table arrangement and a track plan for each show so we have a "schematic" to work from to ease on setup. Some of us have pre-built modules, (...) (25 years ago, 5-Jun-99, to lugnet.trains, lugnet.trains.org, lugnet.loc.us.mn.msp)
| | | | | | | | Re: Train tables Paul Foster
| | | | | It seems to me that there are two fundamental differences between the PNLTC and the GMLTC. Even though I live within I hour of the GMLTC, it would be almost impossible for me to build my own module and just show up at some of the GMLTC train shows (...) (25 years ago, 5-Jun-99, to lugnet.trains, lugnet.trains.org, lugnet.loc.us.mn.msp)
| | | | | | | | | | Re: Train tables John Neal
| | | | | (...) Actually, yes the track pops out at exactly the same place on every module, 2 studs in for the outside loop, and another 4 studs in after that for the second loop. (...) Well, they don't *have* to, it's just much easier that way. If y'all are (...) (25 years ago, 5-Jun-99, to lugnet.trains, lugnet.trains.org, lugnet.loc.us.mn.msp)
| | | | | | | | | | | | Re: Train tables John Gerlach
| | | | | | (...) understand the (...) *each* (...) studs in (...) John, you've got that backwards. 4 studs to the outside track, 2 studs between the tracks. (And 20 bricks + 1 plate above the baseplates! <grin>) <much more snipped> J1 (25 years ago, 6-Jun-99, to lugnet.trains, lugnet.trains.org, lugnet.loc.us.mn.msp)
| | | | | | | | | | | | | | Re: Train tables John Neal
| | | | | | (...) Oops. Yeah, well, waddya expect-- I'm just a rookie...d:-) -J2 (...) (25 years ago, 6-Jun-99, to lugnet.trains, lugnet.trains.org, lugnet.loc.us.mn.msp)
| | | | | | | | | | | Re: Train tables Larry Pieniazek
| | | | | (...) Naa. Neither approach is **better**. They are just different. (...) Sure. To do a PNLTC module base takes some wood, some paint, some hardware. 100 bucks at most, and that's no doubt high. Then there is the track itself, as well as the (...) (25 years ago, 6-Jun-99, to lugnet.trains, lugnet.trains.org, lugnet.loc.us.mn.msp)
| | | | | | | | | | | | Re: Train tables Paul Foster
| | | | | (...) But you still have to have an even number of modules, right? So "A" module under construction will only replace one of Conan's modules until another module can be paired with it? (25 years ago, 7-Jun-99, to lugnet.trains, lugnet.trains.org, lugnet.loc.us.mn.msp)
| | | | | | | | | | | | Re: Train tables Larry Pieniazek
| | | | | Paul Foster wrote: > (...) Yes, unless one built some sort of "wye" module, all the modules in use must form a single closed loop (in the meta sense) to allow continuous running. (25 years ago, 7-Jun-99, to lugnet.trains, lugnet.trains.org, lugnet.loc.us.mn.msp)
| | | | | | |