|
GATS contacted MichLTC on the Thursday before the event. A model railroad club
had pulled out at the last second and we were called in to save the day. We were
able to get a 10x12.5 layout planned in less than 48 hours and GATS was very
happy with our help.
Show Report and More
Pictures
Enjoy!
Jason Spears
MichLTC/MichLUG
http://www.michlug.org
|
|
Message has 1 Reply:
3 Messages in This Thread:
- Entire Thread on One Page:
- Nested:
All | Brief | Compact | Dots
Linear:
All | Brief | Compact
|
|
|
|