To LUGNET HomepageTo LUGNET News HomepageTo LUGNET Guide Homepage
 Help on Searching
 
Post new message to lugnet.technicOpen lugnet.technic in your NNTP NewsreaderTo LUGNET News Traffic PageSign In (Members)
 Technic / 13528
  Re: 4 section boom
 
Is this why on those big cranes (Demag AC 500) there are a small set of wisible pulleys on the ouraaise left side of the boom? Thanks. Thanks for the drawing. Very helpful! Keep on building cranes! (20 years ago, 17-Jan-05, to lugnet.technic)
 
  Re: 4 section boom
 
(...) Nope, those are cables for the various sensors that have to reach up to the boom tip. Modern cranes like the AC500 have the ability to extend each segment separately. They use a hydraulic ram inside and a series of locking devices. If you (...) (20 years ago, 17-Jan-05, to lugnet.technic)
 
  Re: 4 section boom
 
(...) This series of pictures shows an AC100 extending it's boom one section at a time: (5 URLs) ROSCO (20 years ago, 17-Jan-05, to lugnet.technic, FTX)

©2005 LUGNET. All rights reserved. - hosted by steinbruch.info GbR