To LUGNET HomepageTo LUGNET News HomepageTo LUGNET Guide Homepage
 Help on Searching
 
Post new message to lugnet.starwarsOpen lugnet.starwars in your NNTP NewsreaderTo LUGNET News Traffic PageSign In (Members)
 Star Wars / 5162
5161  |  5163
Subject: 
7161 Gungan Sub
Newsgroups: 
lugnet.starwars
Date: 
Mon, 27 Dec 1999 10:35:17 GMT
Viewed: 
590 times
  
Actually there isnt very much you have to do to get that 3rd sub, no extra
pieces need to be added, no pieces have to be removed. Firstly remove the
front sub, it has two connector lugs sticking out the back. Secondly add the
smaller of the two engine bits (the one with the two propellors) to the first
sub. Thirdly, the compartment that holds the two spare engine bits slides out
of the main body and joins onto the propellor engine. Simple huh? Cheers,
Richard



1 Message in This Thread:

Entire Thread on One Page:
Nested:  All | Brief | Compact | Dots
Linear:  All | Brief | Compact
    

Custom Search

©2005 LUGNET. All rights reserved. - hosted by steinbruch.info GbR