Subject:
|
7161 Gungan Sub
|
Newsgroups:
|
lugnet.starwars
|
Date:
|
Mon, 27 Dec 1999 10:35:17 GMT
|
Viewed:
|
718 times
|
| |
| |
Actually there isnt very much you have to do to get that 3rd sub, no extra
pieces need to be added, no pieces have to be removed. Firstly remove the
front sub, it has two connector lugs sticking out the back. Secondly add the
smaller of the two engine bits (the one with the two propellors) to the first
sub. Thirdly, the compartment that holds the two spare engine bits slides out
of the main body and joins onto the propellor engine. Simple huh? Cheers,
Richard
|
|
1 Message in This Thread:
- Entire Thread on One Page:
- Nested:
All | Brief | Compact | Dots
Linear:
All | Brief | Compact
|
|
|
|