| | Re: Rollout of the New Space Shuttle Intrepid Bryan Hodges
| | | (...) <snip> (...) and booster rockets, as well as a launch pad and a maintenance rack... <G> but if you don't, I'll be satisfied with just the shuttle... ;) -Bryan hobartrus@hotmail.com (URL) (24 years ago, 11-Jan-01, to lugnet.space, lugnet.build)
| | | | | | | | Re: Rollout of the New Space Shuttle Intrepid J. Spencer Rezkalla
| | | | | (...) Not surprisingly I have thought about the above things. When you've made it this far, funny things pop into your head :) The orbiter itself has been constructed with reinforced external tank mounting points. There are a couple of things (...) (24 years ago, 12-Jan-01, to lugnet.space, lugnet.build)
| | | | | | | | | | | | Re: Rollout of the New Space Shuttle Intrepid Joel Jacobsen
| | | | | (...) Suuuuuure... as long as the noose is around your neck, you might as well jump off the horse.... right? :) I've been that far before.. but on MUCH smaller "big" projects - big to me, I guess. :) (...) Actually, as I recall - the first few (...) (24 years ago, 17-Jan-01, to lugnet.space, lugnet.build)
| | | | | | |