| | Re: RCX controlled GBC train drawbridge
|
| (...) Heres a thought. Just have the slope going in the other direction. That way when it lifts, the balls keep rolling the same direction. (Faster and efficient!) If the raising is too bumpy, just find a way to place a third or fourth overhead rail (...) (18 years ago, 7-Feb-07, to lugnet.robotics, lugnet.org.us.laflrc)
| | | | Re: RCX controlled GBC train drawbridge
|
| (...) One down side here, is that the "ball-lift" must be shut-off when the bridge is raised, and the controller for the ball lift is on the "bridge" (other) side of the opening. But, along those lines, if there is a bin to catch lose balls, the (...) (18 years ago, 7-Feb-07, to lugnet.robotics, lugnet.org.us.laflrc)
| |