To LUGNET HomepageTo LUGNET News HomepageTo LUGNET Guide Homepage
 Help on Searching
 
Post new message to lugnet.roboticsOpen lugnet.robotics in your NNTP NewsreaderTo LUGNET News Traffic PageSign In (Members)
 Robotics / 26836
    Re: RCX controlled GBC train drawbridge —John Brost
   (...) I am 100% thinking along the same line. At first I thought of simply stopping the ball lift and immediately raising the bridge, letting balls along the slope drain backward into a hopper, but after watching the bridge raise and lower, I doubt (...) (18 years ago, 6-Feb-07, to lugnet.robotics, lugnet.org.us.laflrc)
   
        Re: RCX controlled GBC train drawbridge —Brian Davis
   (...) Not long at all. With the 3'+ slopping double-beam track I had at BF '06, I think it only took less than five seconds for them to clear the end... and that was for a *very* shallow slope. Given the time it takes to lift and lower the bridge, (...) (18 years ago, 7-Feb-07, to lugnet.robotics, lugnet.org.us.laflrc)
 

©2005 LUGNET. All rights reserved. - hosted by steinbruch.info GbR