To LUGNET HomepageTo LUGNET News HomepageTo LUGNET Guide Homepage
 Help on Searching
 
Post new message to lugnet.roboticsOpen lugnet.robotics in your NNTP NewsreaderTo LUGNET News Traffic PageSign In (Members)
 Robotics / 26233
    Re: thoughts on gbc module reliability —Steve Hassenplug
   (...) David, Sorry I can't explain this very well, but the leaky bucket will not provide an acceptable interface between the fast & slow modules, like you're suggesting. Steve (18 years ago, 7-Jul-06, to lugnet.robotics)
   
        Re: thoughts on gbc module reliability —Brian Davis
     (...) A simple explaination: the rate in must equal the rate out, or the bucket overflows. Period. (18 years ago, 7-Jul-06, to lugnet.robotics)
   
        Re: thoughts on gbc module reliability —David Hurley
   (...) <sigh> This is why one of designs I mentioned had a second, variable output. One in::two out. If the input rate was say 3 bps, then the two outputs would be equal to 3 (in this case) 1bps and 2bps. I didn't give a very detailed explanation of (...) (18 years ago, 8-Jul-06, to lugnet.robotics)
 

©2005 LUGNET. All rights reserved. - hosted by steinbruch.info GbR