Subject:
|
Re: Greenberg Train Show 3/31-4/1 Willmington MA
|
Newsgroups:
|
lugnet.org.us.nelug
|
Date:
|
Wed, 21 Feb 2001 00:11:52 GMT
|
Viewed:
|
774 times
|
| |
| |
In lugnet.org.us.nelug, Eric Kingsley writes:
> This is just a reminder that we are scheduled to display our layout at the
> next
> Greenbergs show on 3/31-4/1 with setup on 3/30. We will be adding 2 tables to
> the layout for this show which should give us a layout looking something like
> this.
>
> http://www.nelug.org/layout/layoutv2-3.gif
>
> Of course the layout can be tweaked in order to fit MOC's and all but this
> gives you a general idea. I have about doubled my Main Street scene for the
> layout which you can see here.
>
> http://www.nelug.org/members/kingsley/town/temp/
>
> I know others are working on projects as well, if you are planning on having
> something for the layout let us know what you are planning and we can start
> corrdinating the setup.
I have been working on making a few more RCX-automated railroad crossings.
If you can believe it, I don't have enough of a few critical parts to make
too many more! I have most of the important stuff, but I might have to
borrow a few choice parts (micro-motors, dual lighting elements, and 1x1x2
"tube" elements in white and red) or enlist some help to make enough
crossings to make our layout safe. That alone might be a good enough reason
for me to lDraw up the plans and post the NQC code...
If I have extra time, I'll probably leave the buildings to others and
concentrate on motorizing more stuff. For example, I've been playing around
with ways to motorize the track switches. A number of great plans have been
posted here recently. The idea would be to be able to control all the
switches from the center of the layout, without reaching.
> So mark your calendars, the last show was a blast and so should this one.
>
>
> Eric Kingsley
>
> The New England LEGO Users Group
> http://www.nelug.org/
|
|
Message has 1 Reply: | | Re: Greenberg Train Show 3/31-4/1 Willmington MA
|
| Well, i have a crossing already built, it just needs to be motorized. I will bring it to the next meeting (whenever that may be, hopefully before the show), and let you take a look at it to see what I need to do to make it compatable with the (...) (24 years ago, 21-Feb-01, to lugnet.org.us.nelug)
|
Message is in Reply To:
| | Greenberg Train Show 3/31-4/1 Willmington MA
|
| This is just a reminder that we are scheduled to display our layout at the next Greenbergs show on 3/31-4/1 with setup on 3/30. We will be adding 2 tables to the layout for this show which should give us a layout looking something like this. (URL) (...) (24 years ago, 16-Feb-01, to lugnet.org.us.nelug)
|
22 Messages in This Thread:
- Entire Thread on One Page:
- Nested:
All | Brief | Compact | Dots
Linear:
All | Brief | Compact
This Message and its Replies on One Page:
- Nested:
All | Brief | Compact | Dots
Linear:
All | Brief | Compact
|
|
|
|