| | Re: Advanced Design Train Roundhouse
|
|
I took some time last night to give myself some geometry lessons. The results are pleasing. I can be a tad more flexible because it just so happens that each bay is 16 wide at the start of the track that leads into the bay (16x (x) baseplates). I (...) (23 years ago, 14-May-02, to lugnet.org.us.lucny, lugnet.trains)
|
|
| | Re: Advanced Design Train Roundhouse
|
|
(...) ago (...) ideas (...) interlocked (...) Dear Wayne, I have some (mainly bad) experience in building a roundhouse. So I will try to comment some of the weak spots, that I found. This has been the first version of the roundhouse in late 1999: (...) (23 years ago, 14-May-02, to lugnet.org.us.lucny, lugnet.trains)
|
|
| | I-Move Rental Station
|
|
Hello All. I was able to get home for the weekend and take some pictures of my I-Move Rental Station. While I was home I also built the first of two "self-storage" buildings. In addition I built the first of several billboards which I think would (...) (23 years ago, 14-May-02, to lugnet.org.us.lucny)
|
|
| | Re: Advanced Design Train Roundhouse
|
|
(...) Yes, and it automated and it was brilliant, although I am not the one to talk about it-- it was the programming of J-1 (John Gerlach). But briefly, he had it where there were 3 small locos in bays 1-3-5 and had the turntable automatically turn (...) (23 years ago, 14-May-02, to lugnet.org.us.lucny, lugnet.trains, lugnet.trains.org.scltc)
|
|
| | Re: Advanced Design Train Roundhouse
|
|
(...) John, Was that a working roundhouse? Is so, do you remember what controlled it all? Robert Powell SCLTC (23 years ago, 14-May-02, to lugnet.org.us.lucny, lugnet.trains, lugnet.trains.org.scltc)
|