To LUGNET HomepageTo LUGNET News HomepageTo LUGNET Guide Homepage
 Help on Searching
 
Post new message to lugnet.org.ca.rtltorontoOpen lugnet.org.ca.rtltoronto in your NNTP NewsreaderTo LUGNET News Traffic PageSign In (Members)
 Organizations / Canada / rtlToronto / 1998
1997  |  1999
Subject: 
Re: Nuts for Train2
Newsgroups: 
lugnet.org.ca.rtltoronto
Date: 
Fri, 10 Aug 2001 01:26:35 GMT
Viewed: 
944 times
  
In lugnet.org.ca.rtltoronto, Calum Tsang writes:
Some preshow notes:

Figure out how you are going to move your modules NOW.  Think about this.
Because I just spent most of the day thinking about it, and my head hurts. :)

Bring bolts and nuts to assemble the modules together.   Lots of them.  2"
long 1/4" will do fine.  If anyone wants to buy some nuts, by some fluke (my
stupidity) I have 24 extra bolts now.  I don't know what threading they are,
but they're the kind from bin 129004/129100 at Home Depot.

The final layout map is online, available from the link off the show info
page. See y'all on Saturday.

Calum

Well I'm going to have to transport my modules empty....I know this sort of
defeats the purpose of having them (sort of), but with 6 modules and one "car"
it is kind of hard....I can put 4 of them in the back (I think), and 2 in
the back seat "inverted"...

I should have enough space left over (I HOPE!!!!) to bring the rest of the
stuff including the monorail line that Tim wants....Hey Tim, you might want
to build a "small" monorail station at the end of your airport the side
closest to my module....on the corner plate - I have a stop on the monorail
line (and a small station on the other side of the line...I will build a
monorail car with exits  on both sides....so your airport will be able to
service the visitors to the stadium  and those wishing to go to the
train station....as it will be upgraded tonight and make it open to both
LRT and monorail traffic.

That is one of the only things I need to work on....the monorail car,
the monorail upgrade for the train station, and the road bridge....

I also need to drill holes in my modules  for the bolts....I have 25
bolts  and a box of 100 nuts, and a box of 100 washers.  I will bring them,
and if there is any additional room, I will bring my about 20 curve track,
the rest of my straight track (which is only about 10 or 15 at the most,
and the remaining switch track (3 left? and 1 right).

So tomorrow should be very busy, but if I do everything by tomorrow night,
I can leave early on Saturday, and quickly unpack my car....so it won't
take long...


Benjamin Medinets



Message is in Reply To:
  Nuts for Train2
 
Some preshow notes: Figure out how you are going to move your modules NOW. Think about this. Because I just spent most of the day thinking about it, and my head hurts. :) Bring bolts and nuts to assemble the modules together. Lots of them. 2" long (...) (23 years ago, 9-Aug-01, to lugnet.org.ca.rtltoronto)

2 Messages in This Thread:

Entire Thread on One Page:
Nested:  All | Brief | Compact | Dots
Linear:  All | Brief | Compact
    

Custom Search

©2005 LUGNET. All rights reserved. - hosted by steinbruch.info GbR