To LUGNET HomepageTo LUGNET News HomepageTo LUGNET Guide Homepage
 Help on Searching
 
Post new message to lugnet.org.ca.nalugOpen lugnet.org.ca.nalug in your NNTP NewsreaderTo LUGNET News Traffic PageSign In (Members)
 Organizations / Canada / NALUG / 490
    Re: SuperTrain 2001 layout prep Saturday? —James Brown
   (...) Ok, official it is, then. :) My place, this Saturday, aiming for noon. I can do a pick up (and drop off)run for anyone who can't otherwise get a ride. On the agenda: barricade making Supertrain layout discussion mountain design general yakking (...) (24 years ago, 10-Jan-01, to lugnet.org.ca.nalug)
   
        Re: SuperTrain 2001 layout prep Saturday? —Michel Magnan
     Thanks for offering your place James. I might be a bit late, we won't be leaving St Paul until Saturday morning, I'll have my wife drop me off at your door on our way into Edmonton. (James, I misplaced your street address, could you email it to me (...) (24 years ago, 11-Jan-01, to lugnet.org.ca.nalug)
   
        Re: SuperTrain 2001 layout prep Saturday? —Chris Gray
     (...) Thanks - it's likely easier for someone in town to get both myself and John. What's everyone else's status on this? (...) Sounds good to me. Want me to bring my BURPs? I have a tub of the big ones and a bucket of the little ones. You must have (...) (24 years ago, 11-Jan-01, to lugnet.org.ca.nalug)
   
        Re: SuperTrain 2001 layout prep Saturday? —Steve Chapple
   (...) Doubtful - The layout is still rather fluid including e-mailing with Calgary. (...) AFAIK the clearance height is fourteen bricks including track. ie. Set the train on some track on a table, and put a stack of fourteen bricks beside it - the (...) (24 years ago, 11-Jan-01, to lugnet.org.ca.nalug)
   
        Re: SuperTrain 2001 layout prep Saturday? —James Brown
     (...) Hmm. Ok then, I want it enough set in stone that we can start building usefully. I want to know how much room we've got for town (container yard, Octan yard, rail yard, etc) Some of that stuff we can fake, but I really want to be able to just (...) (24 years ago, 11-Jan-01, to lugnet.org.ca.nalug)
    
         Re: SuperTrain 2001 layout prep Saturday? —Steve Chapple
     (...) Agreed - I think we can get solid enough. The main thing is what mountain configuration to use (so it can be built) right? That part at least we should be able to put in stone. (pun intended) ;-) Whatever I (we) decide on 3 or 4 tracks and (...) (24 years ago, 11-Jan-01, to lugnet.org.ca.nalug)
    
         Re: SuperTrain 2001 layout prep Saturday? —James Brown
     (...) Yes and no. I definitely want the mountain down, but I'd also really like a solid setting for the town. We can build some things before knowing what space we've got, but a lot of stuff is going to have to wait - it's hard to build something (...) (24 years ago, 11-Jan-01, to lugnet.org.ca.nalug)
    
         Re: SuperTrain 2001 layout prep Saturday? —Steve Chapple
     (...) The town can be as solid as you want it - I was intending to leave that section pretty much up to you. ie. There's tracks entering it here and here, which should loop back to here and here and the overall dimensions should be this by that. (6' (...) (24 years ago, 13-Jan-01, to lugnet.org.ca.nalug)
   
        Re: SuperTrain 2001 layout prep Saturday? —Steve Chapple
   I just wanted to publicly thank Michel and James and the rest of NALug for their help on Saturday making barricades for the show next month. SRC StRuCtures (24 years ago, 15-Jan-01, to lugnet.org.ca.nalug, lugnet.trains.org)
 

©2005 LUGNET. All rights reserved. - hosted by steinbruch.info GbR