| | Re: SuperTrain 2001 layout - Switching Yard
|
| (...) Er, one of the tracks isn't connected. So, thats 1173 pieces of train track. My guess is about a minute to place each one. Some as little as a couple seconds, but overall, I think that's a not unexpected rate. That's a *lot* of time! P.S. I've (...) (24 years ago, 6-Jan-01, to lugnet.org.ca.nalug, lugnet.trains)
| | | | Re: SuperTrain 2001 layout - Switching Yard
|
| (...) Yeah - I noticed that AFTER I'd posted it - there should be another switch in there, plus there's still more to add to the totals. Between Michel and I we have almost 250 curved segments which should be plenty. Straights are another story (...) (24 years ago, 6-Jan-01, to lugnet.org.ca.nalug, lugnet.trains)
| | | | Re: SuperTrain 2001 layout - Switching Yard
|
| (...) A quick suggestion that will save you some time: Pre-assemble your straight track into 4 piece long segments. You should be able to find a box large enough to carry them. That way, when you're setting up at the show, you'll be able to do it (...) (24 years ago, 6-Jan-01, to lugnet.org.ca.nalug, lugnet.trains)
| |