 | | Re: NALUG a hit at the Great Edmonton Train Show Sept 22-23, 2001
|
|
(...) Easily enough; we can't even claim credit for the idea (though I don't recall who we stole it from): Electrical tape. A bit of electrical tape to break the conductivity between adjoined track sections, and multiple controllers per loop. (I (...) (25 years ago, 27-Sep-01, to lugnet.org.ca.nalug)
|
| |
 | | Re: NALUG a hit at the Great Edmonton Train Show Sept 22-23, 2001
|
|
(...) Everything looks terrific!! Great work! (...) So I am dying to know how you peformed this feat. Can you share? Thanks! Jake --- Jake McKee AFOL LUGNET Member #211 (25 years ago, 27-Sep-01, to lugnet.org.ca.nalug)
|
| |
 | | Re: NALUG a hit at the Great Edmonton Train Show Sept 22-23, 2001
|
|
In lugnet.org.ca.nalug, James Brown writes: <snip> (...) Our (my) mountain has 16 studs between the tracks. We did decide not to go around a corner with it, so I don't have that pickle to deal with. The inside track has a 12 studs spacing, so most (...) (25 years ago, 27-Sep-01, to lugnet.org.ca.nalug, lugnet.org.us.michlug)
|
| |
 | | Re: NALUG a hit at the Great Edmonton Train Show Sept 22-23, 2001
|
|
(...) Thanks! I'm not the modeller a lot of Lugnuts are, but I do pride myself on being able to make a good mountain. :) The trestle was a combo effort between John & I, and the funicular was Michel's design. (...) <Nod nod> It was certainly a (...) (25 years ago, 27-Sep-01, to lugnet.org.ca.nalug, lugnet.org.us.michlug)
|
| |
 | | Re: NALUG a hit at the Great Edmonton Train Show Sept 22-23, 2001
|
|
(...) Heh. Thank a slow morning at work for that. :) (...) That was Steve's idea. I'd been trying to think of something tasteful to put on the layout, and was drawing a blank when Steve suggested the flags. They were half-mast on Saturday, and back (...) (25 years ago, 27-Sep-01, to lugnet.org.ca.nalug, lugnet.trains, lugnet.loc.us.ca.sf)
|