 | | Re: SuperTrain 2001 layout latest
|
| (...) He's still checking on the height (and strength) of the blue barriers, but the overall plan is A-OK. 8-) I will now make a more detailed layout plan and get the town dimensions to James as soon as I can. SRC StRuCtures (26 years ago, 22-Jan-01, to lugnet.org.ca.nalug)
| | |  | | Re: Show report
|
| (...) I'd say a subset of gluing, but what about the electrical tape... :-) SRC StRuCtures (26 years ago, 20-Jan-01, to lugnet.trains.org, lugnet.org.ca.nalug)
| | |  | | Re: Show report
|
| (...) It involves cutting but no gluing or painting! How about soldering--is that a fourth deadly sin, a subset of gluing (joining?), or is it just venial? Peter (26 years ago, 19-Jan-01, to lugnet.trains.org, lugnet.org.ca.nalug)
| | |  | | Re: Show report
|
| (...) A problem we encountered with wiring was wire length. Because we did not have enough long (Mindstorms) wires we had to place controllers in inconvienent places. If you are not a 100% purist you should consider making some long exteneders. Some (...) (26 years ago, 19-Jan-01, to lugnet.trains.org, lugnet.org.ca.nalug)
| | |  | | Re: Three Dimensions (was: Show report)
|
| (...) I thought there was rule that at some point on the layout the trains had to cross over each other. ;-) The layout we are working on has a climb into a mountain, where a ski resort will be and three tunnels to provide transaction from scene to (...) (26 years ago, 19-Jan-01, to lugnet.trains.org, lugnet.org.ca.nalug)
| |