|
| | Re: Train tables
|
| (...) But you still have to have an even number of modules, right? So "A" module under construction will only replace one of Conan's modules until another module can be paired with it? (25 years ago, 7-Jun-99, to lugnet.trains, lugnet.trains.org, lugnet.loc.us.mn.msp)
| | | | Re: Train tables
|
| (...) Oops. Yeah, well, waddya expect-- I'm just a rookie...d:-) -J2 (...) (25 years ago, 6-Jun-99, to lugnet.trains, lugnet.trains.org, lugnet.loc.us.mn.msp)
| | | | Re: Train tables
|
| (...) understand the (...) *each* (...) studs in (...) John, you've got that backwards. 4 studs to the outside track, 2 studs between the tracks. (And 20 bricks + 1 plate above the baseplates! <grin>) <much more snipped> J1 (25 years ago, 6-Jun-99, to lugnet.trains, lugnet.trains.org, lugnet.loc.us.mn.msp)
| | | | Re: Train tables
|
| (...) Naa. Neither approach is **better**. They are just different. (...) Sure. To do a PNLTC module base takes some wood, some paint, some hardware. 100 bucks at most, and that's no doubt high. Then there is the track itself, as well as the (...) (25 years ago, 6-Jun-99, to lugnet.trains, lugnet.trains.org, lugnet.loc.us.mn.msp)
| | | | Re: Train tables
|
| (...) Actually, yes the track pops out at exactly the same place on every module, 2 studs in for the outside loop, and another 4 studs in after that for the second loop. (...) Well, they don't *have* to, it's just much easier that way. If y'all are (...) (25 years ago, 5-Jun-99, to lugnet.trains, lugnet.trains.org, lugnet.loc.us.mn.msp)
| |