To LUGNET HomepageTo LUGNET News HomepageTo LUGNET Guide Homepage
 Help on Searching
 
Post new message to lugnet.loc.auOpen lugnet.loc.au in your NNTP NewsreaderTo LUGNET News Traffic PageSign In (Members)
 Local / Australia / 14287
14286  |  14288
Subject: 
Re: How did the EWB wind turbine event go?
Newsgroups: 
lugnet.loc.au
Date: 
Sat, 1 Sep 2007 12:38:11 GMT
Viewed: 
5953 times
  
In lugnet.loc.au, Kerry Raymond wrote:
   I didn’t hear any followup of the EWB wind turbine event?

How long did it take the public to build them? Did the public even come? Etc etc.

Oops sorry for not posting. I attended both Melbourne events, you can read about it here, including some pics. I will post more info when it becomes available. Word from the organisers on the day was they were very happy with the turnout.

For those interested, I provided the initial design for the tower and blades, the hub was designed by EWB and contained 2 geared Technic motors turning 5x faster than the hub, which were used both to drive the blades, and to generate power to light a small LED EWB sign.

ROSCO



Message is in Reply To:
  How did the EWB wind turbine event go?
 
I didn't hear any followup of the EWB wind turbine event? How long did it take the public to build them? Did the public even come? Etc etc. Kerry (17 years ago, 31-Aug-07, to lugnet.loc.au)

2 Messages in This Thread:

Entire Thread on One Page:
Nested:  All | Brief | Compact | Dots
Linear:  All | Brief | Compact
    

Custom Search

©2005 LUGNET. All rights reserved. - hosted by steinbruch.info GbR