|
Its been a while but Im back. And now that it is officially summer, what
better way to kick things off than with a summer study- Study 24.
Not the longest or tallest bridge (H=24.5, L=73), it is the first to really
use schleim/SNOT not just for aesthetics but structurally too.
Study 24 is also the first bridge to use a real floater system like real bridges
do. Eight (four under each roadway) are holding it all up.
And the schleim/SNOT technique- check out all those 2x2x3 steep sloped set
upside down. (Ill add some more pics of how I did this later.)
For more pics please check out the Flickr page (sorry- quit using BricksShelf
last year)
http://www.flickr.com/photos/74791990@N00/sets/72157620270278726/
Adr.
|
|
Message has 1 Reply: | | Re: Summer's Bridge Study 24
|
| Super! I always enjoy seeing your Bridge Studies. Oooh the supports on this one look great! Really nice to see your work. Best regards, Eric Sophie (15 years ago, 23-Jun-09, to lugnet.build)
|
2 Messages in This Thread:
- Entire Thread on One Page:
- Nested:
All | Brief | Compact | Dots
Linear:
All | Brief | Compact
|
|
|
|