Subject:
|
Re: Brand New Rigs at Sixby Fire Tech
|
Newsgroups:
|
lugnet.build
|
Date:
|
Mon, 4 Jan 1999 05:06:12 GMT
|
Viewed:
|
705 times
|
| |
| |
Jeff Christner wrote:
>
> I do read LUGNET groups all the time, but I'm always afraid my posts
> will get messed up somehow, so I usually only post if I've got
> something new built, and such is the case now. I'm not even sure if
> I've got this set up correctly yet.
>
> I have added three new rigs to Sixby Fire Tech. All three are part of
> our new Vision Series of apparatus and feature newly redesigned pump
> panels, a lower profile, and fully enclosed 3 man cabs.
>
> The new rigs are the Vision Pumper - a high volume pumper with top
> mount pump panel controls that carries an actual 82" of hose, a Vision
> Quint - with a 3 section ladder and lots of tools, and the Vision
> Rescue - a full size rescue/haz-mat with full pumping capabilities,
> new compartments, storage on the roof of the apparatus, and a light
> tower.
>
> All these new rigs can be found under the Vision Series links at:
>
> http://members.aol.com/regult/sixby.html
>
> Or, if you want to get me some hits thru the Hyattsville Volunteers or
> Firehouse.com, go to one (or both) of these, and follow the link to my
> site.
>
> http://www.hvfdweb.com/links/Business/Collectibles/
> http://firehouse.com/links/Business/Collectibles/
>
> If you have any questions or comments on the new Vision Series of
> apparatus, or any of the older rigs pictured there, feel free to
> contact me, here or via E-Mail.
>
> Jeff Christner
>
> Visit Sixby Fire Tech and The Nova Industrial RR at http://members.aol.com/regult/
>
> If you reply to me via email, be sure that it is going to regult@aol.com as I may not have all my settings correct here.
Pretty cool, hard to believe that you can keep topping yourself
each time you build something new. The walk though pump are of
the pumper is pretty realistic.
Just how hard are those shoelace hoses to make? Purists please take
cover.
--
Paul Foster
http://reality.sgi.com/foster_stco/lego.html
|
|
Message has 1 Reply: | | Re: Brand New Rigs at Sixby Fire Tech
|
| (...) Paul, the shoelaces are almost too easy to make, for the record, here is how to do it: The supply lines are made from 5/16" wide shoelaces while the attack lines are made from 3/16" shoelace. The supply lines are easier to make. Just take a (...) (26 years ago, 4-Jan-99, to lugnet.build)
|
Message is in Reply To:
| | Brand New Rigs at Sixby Fire Tech
|
| I do read LUGNET groups all the time, but I'm always afraid my posts will get messed up somehow, so I usually only post if I've got something new built, and such is the case now. I'm not even sure if I've got this set up correctly yet. I have added (...) (26 years ago, 4-Jan-99, to lugnet.build)
|
3 Messages in This Thread:
- Entire Thread on One Page:
- Nested:
All | Brief | Compact | Dots
Linear:
All | Brief | Compact
This Message and its Replies on One Page:
- Nested:
All | Brief | Compact | Dots
Linear:
All | Brief | Compact
|
|
|
|