| | Trains, Car and Level Crossing Automatic Control System
|
| This system is used 4 RCXs to control 2 trains, 1 car and 1 level crossing. RCX1 is used to control 3 switch points and response 3 light sensors. RCX2 is used to control 3 segments track and response 2 light sensors. RCX3 is used to control level (...) (16 years ago, 6-Sep-08, to lugnet.announce.moc, lugnet.trains, lugnet.robotics.rcx.legos) !
| | | | Re: Trains, Car and Level Crossing Automatic Control System
|
| (URL) (16 years ago, 6-Sep-08, to lugnet.trains, FTX)
| |